Switchgear Magazine Volume 03 Issue 3

Please log in to access the magazine.

Editorial Message

2032 arrives in 2028
Every number in this issue has another number behind it, and the second one is the one that matters.

Julian Aditya, TenneT’s asset specialist for HVDC and AC switchgear, gave us two numbers in the same interview (p.80). The first: the EU’s phase-out of SF₆ in new switchgear on a tiered schedule, with the highest voltage classes coming last. For the class of equipment he deals with, the deadline is 2032.

The Sub-Cycle Crisis

Using a modelled 50 MW interconnection, this article examines how triplen harmonics could overload neutral conductors, increase transformer losses and amplify capacitor-bank resonance.

Locked Data, Limited Intelligence

This article examines how fragmented datasets, inconsistent metadata, and overconfident models limit AI-assisted dissolved gas analysis.

Partial Discharge and Its Types

Partial discharge is not a single fault mode; corona, surface discharge, and internal discharge develop in different locations, arise from different conditions, and demand different maintenance responses.

The Forty-Year Assets, Ten-Year Promises

Digital substations combine primary equipment designed for 40 year lifetimes with software, firmware, and vendor support cycles that may last only a decade.