2032 arrives in 2028
Every number in this issue has another number behind it, and the second one is the one that matters.

Julian Aditya, TenneT’s asset specialist for HVDC and AC switchgear, gave us two numbers in the same interview (p.80). The first: the EU’s phase-out of SF₆ in new switchgear on a tiered schedule, with the highest voltage classes coming last. For the class of equipment he deals with, the deadline is 2032.

The second: lead times on 400 kV equipment run three to four years. Count backwards and the last practical purchase order lands somewhere around 2028, which is not far away. It sits inside capital plans being defended this quarter.
This pattern runs through the issue. A published number planned around, and a second number behind it that decides whether the first was ever achievable. The second one rarely makes the press release.

Christine Byrne (p.98) provides a clear example. Capturing pole condition has never been faster or cheaper: drone corridors, LiDAR surveys, routine field photography. But images are not engineering-ready pole models. Converting them still takes twenty to thirty minutes of skilled labour for each structure.

So beneath “we surveyed the network” lies the arithmetic. A hundred thousand poles at twenty-five minutes each is more than 40,000 hours total, or 1000 work-weeks. Suddenly, the bottleneck in a DER interconnection queue looks less like a technology problem and more like a shortage of skilled time.

Mica Tufillaro (p.74) finds hidden numbers inside the sampling interval. Conventional SCADA reports 15-minute averages, while a hyperscale data centre’s GPU cluster can ramp from zero to tens of megawatts in seconds. A load can swing sharply within a reporting window and still appear on the trend as a flat line with the voltage regulation, the tap-changer duty and the reserve response all taking place between samples. A load profile that engineers can see and dislike is one kind of problem. A load which telemetry smooths out of existence is something else.

At the other end of the time scale, Qiang Tang and Shenli Jia (p.16) examine meshed HVDC grids. There is no current zero, and faults can rise at 10 kA/ms. The breaker has only milliseconds to sense, commutate, and clear. Five topologies compete within that narrow window, each trading interruption speed against on-state loss and cost, and no two asset owners weigh that trade the same. Their survey lists all five, which is more than most operators have in front of them at a time.

Gaurav Joshi (p.110) draws the line between a signal and a diagnosis. Information about partial discharge has little value until the discharge is classified correctly. Read external corona as an internal defect and maintenance money is spent for no good reason. Dismiss surface tracking as noise and the asset will fail on its own schedule.

Detection and diagnosis are different capabilities. The dashboard can tell you that something happened. It cannot tell you what.
For Florent Giraudet (p.48), the second number is twenty-five years. The physics of resistive leakage current in metal-oxide arresters was understood by 1997. What was missing was low-cost electronics capable of putting that knowledge to work in the field. The arrester did not change. The economics of measuring it did.
Sven Friedel (p.32) discusses multiphysics modelling, which has already replaced physical prototyping across much of switchgear and transformer design. He cites an ABB Semiconductors case in which modelling thermomechanical stress extended the power-cycled life of an IGBT by a factor of four.

But he is also clear about the method’s limits. The first result from a model is not the truth; it is a starting point that must be refined against measurements. Sometimes faults such as cyclic dielectric stress still lack the theoretical basis needed for rigorous modelling. Twenty years of watching engineers use the software left him with a sentence worth remembering: “The output of the process should not be data, but insight and trust”.

Marius Grisaru (p.88) has the widest gap between two numbers anywhere in these pages. A modern transmission utility generates tens of thousands of dissolved gas records each year. The public database used to train diagnostic models contains a mere 117 cases.

The controls standing between those figures are individually defensible: CIP-011, NIS2, and ordinary commercial confidentiality. Put them together, however, and an industry sitting on an ocean of operational data is left with a remarkably small training set. We collect the data. We just don’t learn from it collectively.

Hyosung’s ARMOUR+ (p.26) works with the same raw material at fleet level, turning operational history into a health index, a failure probability, and an investment ranking. Whether a vendor platform closes Grisaru’s data funnel or moves it indoors is a question the two pieces raise between them.

My own contribution is on p.116. Forty years is the standard life requirement for transformers and circuit breakers. The number behind it is how many times the digital half of the substation will be replaced before that breaker reaches its first major overhaul.

Every capital plan has an in-service date. Fewer show the order date behind it, the support-expiry date behind that, or the date when regulation changes beneath all three. Those dates rarely appear in the same document.

They should.